• 新手任务领券
  • 入门指引
  • 帮助中心
  • 供应商中心

热卖兰角罗厨房储物架,壁挂式无钻孔,刀架,壁挂式锅盖架,排水储物架

SKU:
一件代发
大宗采购
  • ¥ 38.30
  • 原价:
  • ¥0.00
  • 优惠
  • ¥999999 ~ 0
  • ¥999999 ~ 0

0

累计评价

0

累计销量

卖家:
实力厂家 授权卖家 joybuy sellected>
发货仓库:
仓库名称 所在地 类型 库存 状态
京东国际总仓 中国 京东云仓 2 0 0 现货 在途
京东国际总仓 中国 京东云仓 11 0 0 现货 在途
收货城市:
预估运输时效?
物流费用:
包邮预估运输时效1
物流费用:
物流公司 运输时效 物流费 选择
  • 数量:
  • - +
批发价格:
采购数量 价格
批发价格:
采购数量 价格
*联系人姓名:
*联系电话:
*采购数量:
详情需求

属性

风格: 现代风格
类别: 壁挂式厨房货架
车身材料:
国家注册模式: 锅具收纳架

包装属性

毛重量(kg): 0.26
长(cm): 24.2
宽(cm): 8.5
高(cm): 6

**Product Specifications:**

**Brand:** Lazy Corner

**Features:**

- Stable hanging without fear of oil stains, dual-purpose for storing cutting boards and pot lids, easily expanding wall space, showcasing scenes.

- Rust-proof, easy to clean, non-stick to oil stains.

- Smooth paint finish, rounded corners for safety, stable placement to prevent falling.

- Even paintwork, excellent craftsmanship, smooth corners and delicate edges.

- Adhesive installation with strong weight-bearing capacity, certified by Deutschland, 3N SEALANT.

**Specifications:**

- **Product Name:** Kitchen Wall Hanging Shelf

- **Main Material:** Iron

- **Painting Process:** Double spray painting for ironwork

- **Weight Capacity:** Integrated cutting board rack ≤ 5kg

- **Execution Standard:** GB/T23994-2009, GB/T3325-201

**Additional Information:**

- This product is available in a single color and design, for other sizes please refer to the specifications.

- Suitable for smooth tiles, smooth marble, hard glass, smooth metal; not suitable for drilling on walls such as plaster, wallpaper, painted walls, uneven tiles, uneven marble, uneven metal, or hard wood walls.

**Installation Method:**

- **Adhesive Installation:**

1. Clean the wall surface with a dry towel.

2. Mark the installation position of the base on the wall and ensure the wall and surrounding environment are dry.

3. Apply adhesive to the back of the base.

4. Press the base onto the wall and hold firmly.

5. Place the auxiliary sticker on the base for additional support, remove after 48 hours.

- **Drilling Installation:**

1. Mark the drilling position for the base on the wall.

2. Drill holes in the marked positions on the wall.

3. Insert plastic plugs into the wall holes.

4. Screw the pointed screws through the base into the plastic plugs on the wall.

**Quality Inspection Reports:**

- STT Test Report, SFT Test Report

- Commissioned by Tianjin Strict Quality Control Management Co., Ltd.

- Testing standards compliance: GB316043-2016, G8316042-2016, GB3160400-2006

**Testing Parameters:**

- Moisture content: 1% - 2.9%

- Temperature resistance: 60°C

- Formaldehyde emission: 0.02%

**Testing Authority:** Guangdong SFT Testing Co., Ltd.